Workplace / commercial EV supply check, £195

Done for you, for one site.

£195, no VAT charged. Gridcap is a sole trader and is not registered for VAT.

About 1 to 1.5 hours once the inputs are in. We aim for the same working day or the next working day.

You pay by card on Stripe. Then email the inputs for this one site.

What you send

After you pay, email the following for this one site to support@gridcap.co.uk.

  • Fuse rating or agreed capacity
  • Existing peak, or a half-hourly CSV
  • Proposed chargers, heat pump or battery

What you get

  • We run the supply check for that one site.
  • Where the existing peak comes from half-hourly data, we apply a peak margin.
  • A short 1 to 2 page note with the likely DNO route and the evidence their installer needs.
  • The same calculation pack as the £49 report.

Not included

This price does not include any of the following.

  • A site visit
  • Logger hire
  • Designing the ALM kit
  • Submitting anything to the DNO
  • A guarantee of approval

Generation is flagged as G98 or G99 only. This is not a full G99 study.

Prefer to run it yourself?

The free check and the £49 report are the lower-priced self-serve option. You enter the figures yourself.

Free check and £49 report · Sample of the £49 report (PDF)

Gridcap provides this check and note to support your own application. It does not prepare or submit the application to the DNO. The DNO makes its own decision.